E-lesson

Implementing and Monitoring Overall Equipment Efficiency of Transformers

Free

Hosted by: Alexander Tschoeltsch – Georg, Joachim Ehrig – BR Technology, Ales Bertuzzi – Transformer Process

This e-lesson shows important considerations on how to implement and monitor the Distribution Transformer Process looking at the Overall Equipment Efficiency (OEE) becoming an important KPI which takes into account the mix of Availability with Productivity and Quality.

Lecturers

Alexander Tschoeltsch

Alexander Tschoeltsch

Studied mechanical engineering (University Siegen, Germany)
´1997 Starting as Trainee (GEORG)
´1999 Sales Mgr (GEORG)
´2002 VP Sales at GEORG Manufacturing Systems, Inc. (USA)
´2005 Sales Mgr. (tansformer lines, GEORG)
´2011 Head of Sales (transformer lines, GEORG)

Joachim Ehrig

Joachim Ehrig

´1975 SIEMENS Power Transformer (PT) Assembly
´1984 SIEMENS Automation Production Planner
´1989 SIEMENS PT      Manufacturing Manager
´2009 SIEMENS PT China            GM Traction Transformers
´2013 ASTA Conductors China COO
´2015 BR tech GM Sales Asia-Pacific Region